Took delivery of my swimplatforms.com platform in February and it's been a long wait. Installed it today with a friend and it took 3.5 hrs. The job went well with no trouble. Here are some pics although I forgot to take a pic of the 16 holes in my boat when we removed the platform to apply the sealant around the holes.
un-crated in my garage
I took the packing crate apart and made a working stand
on the stand and starting to get it in position
a good shot of bottle jacks in front and my small floor jack in back....tightly in place and ready for holes to be drilled.
Holes from inside....I marked the platform and my helper drilled as I kept close watch inside. I unfastened the main wire harness from transom.
Done !
splashing her Saturday, curious to see how much if any performance is affected.
un-crated in my garage
I took the packing crate apart and made a working stand
on the stand and starting to get it in position
a good shot of bottle jacks in front and my small floor jack in back....tightly in place and ready for holes to be drilled.
Holes from inside....I marked the platform and my helper drilled as I kept close watch inside. I unfastened the main wire harness from transom.
Done !
splashing her Saturday, curious to see how much if any performance is affected.
Last edited: