Alex F
Well-Known Member
- Nov 14, 2006
- 9,166
- Boat Info
- 2005 420DB with AB 11 DLX Tender, Raymarine Electronics (2x12" MFDs) with Vesper AIS
- Engines
- Cummins 450Cs, 9KW Onan Generator, 40HP Yamaha for tender.
I never had any of my dinghies patched (knock on wood). I'm looking at a dinghy which had a small cut, which was professionally repaired. Those who have knowledge on this, what would be the expected time frame for professionally repaired patch to last?