tobnpr
New Member
I've got (2) 5 gal buckets on the way, going to flush the raw water side of my mains. From what I understand:
Remove or replace zincs after
Block cooling line to dripless seal
Circulate with pump 3-4 hours.
Anyone have experience doing this?
Remove or replace zincs after
Block cooling line to dripless seal
Circulate with pump 3-4 hours.
Anyone have experience doing this?