I view Labor Day as the day to begin to figure out and budget for any mods my boat will see over the winter. It's also the "New Year's Resolution" type of thing to see how many I can keep and get finished. Last year was my electronics mast and computer, major "600 hour maintenance" on the engines (water pumps, heat exchanger flushing, coolant flushing, transmission service, etc), and a professional crew compounding and polishing the topsides.
For the 2008 season, these are my "top 5"
1. Audio/Video upgrade for the inside with HD LCD's and HDTV on the sat system along with a "real" audio and video distribution system.
2. New canvas (I'm at 5 years)
3. Watermaker
4. New overhead custom molded fiberglass electronics box on the bridge (original one is too small)
5. Finish SSB install and spare fixed mount VHF
So... what is everyone elses? We'll look back here in April and see what people thought they could do versus what they actually got done.
Maybe I'll actually get to the Bahamas next summer....
For the 2008 season, these are my "top 5"
1. Audio/Video upgrade for the inside with HD LCD's and HDTV on the sat system along with a "real" audio and video distribution system.
2. New canvas (I'm at 5 years)
3. Watermaker
4. New overhead custom molded fiberglass electronics box on the bridge (original one is too small)
5. Finish SSB install and spare fixed mount VHF
So... what is everyone elses? We'll look back here in April and see what people thought they could do versus what they actually got done.
Maybe I'll actually get to the Bahamas next summer....