brewster16
Well-Known Member
Hi everyone.....I just had some big maintenance done on my Cummins QSC engines and generator. The heat exchangers and aftercoolers were disassembled and boiled. All parts were cleaned, prepped, greased and reinstalled. I have 458 hours on the engines and do most all boating in and around the coastal northeast. The aftercoolers and heat exchangers had some scaling and crud but nothing terrible. Impellers were replaced. At the same time I replaced all of the raw water hoses as many of them were cracked and deteriorated. It took about a week total and about 8K.